尊龙凯时人生需要博

    Your current location: Home > New Energy > Secondary EPC for Centralized New Energy Stations
    Secondary EPC for Centralized New Energy Stations
    System framework


    Supply principles
    • Rapid Supply
      Modular design of software and hardware, automated testing of single boards and complete machines, and a sound production management system
    • Cost Control
      Integrated equipment design, elastically scalable software, and highly integrated hardware functions
    • Two Rules Control
      Equipment selection follows the "Two Rules", grid operation management assessment, and auxiliary service management assessment
    • Comprehensive Products
      Zone I main equipment, Zone II auxiliary equipment, Zone IV smart inspection equipment
    Cases
    • Tianjin Huadian Binhai Hangu 48MW green ecological hybrid PV power generation project
    • Jidong Oilfield self-consumption PV power generation project
    • Guodian Chengde Weichang 100MW PV-energy storage integrated project
    • Datang Huayin Hengnan County Huangji 50MW forestry-PV complementary power generation project
    • Xinjiang Oilfield Company Baijiantan 2022 50MW guaranteed grid-connected power generation project
    • Northwest Power Materials Co., Ltd. Binzhou Longyuan Dafosi 50MW agriculture-PV complementary power generation project
    • Shandong Gaomi Jiaohe Ecological Development Zone agriculture-PV complementary power station 100MW integrated automation system